Installation Instructions

4
D = 1/2" to 3-3/4"
Floor
Basepan
W
A
L
L
Figure 6
2
8
"
6
-
3
/
4
"
Y
=
2
"
-
D
Figure 7
Hydronic
Front
Wall
Sleeve
Finished
Floor
Exterior
Wall
Skirt
Between 0" to 3"
Figure 8
8. Mount the skirt to the metal front with the four remaining
3/8” #8 supplied screws (Figure 9).
NOTE: Skirt is attached to front of top piece during shipping.
S
k
i
r
t
Hydronic Front
(Inside Surface)
3/8" #8 Screws
(Two On Each Side)
Figure 9
9. Remove the six screws from the top of the hydronic top.
Lift the hydronic top straight up and set aside along with
the six screws (Figure 10).
Figure 10
10. Position the wires from the freeze thermostat found on
the left side of the hydronic top so the wires slide through
the slot opening in the hydronic top.
Place all wires into the supplied snap bushing (Figure
11.
SNAP BUSHING
Figure 11
11. Snap the grommet into the hydronic top and pull the
wires forward to take out the slack in the wires (Figure
12).