Instruction manual

1-20
BreezeACCESS Version 4.5 Installation
Manual Revision: 1.0
power source and the black wire to the
-48 VDC contact of the power source. Connect the red wire to the
+ (Return) contact. Connect the shield to the ground.
6. If a BS-PS-AC AC power supply is used, connect the AC power cable to
the AC jack (marked AC IN) located on the front panel of the BS-PS-AC
power supply. If a redundant power supply module is installed, connect a
power cable to that unit as well. Connect the power cable(s) to the AC
mains.
7. Switch the BS-PS or BS-PS-AC power supplies to ON. Verify that all the
power indicator LEDs on the front panel are on. If you are using a
BS-PS-AC power supply module, verify that the OVERTEMP alarm
indicator is off.
8. Configure the basic parameters in all BS-AU modules as described in
Book 3: Commissioning. Set the switches on the front panel of all BS-AU
modules in the chassis to ON only after all the basic parameters have been
configured properly.
This is to avoid transmitting at undesired frequencies.
NOTE:
Disconnect the IF cable from the BS-AU module before inserting or removing it to/from
the BS-SH chassis.