User's Manual

Chapter 3 - Commissioning
BreezeNET B System Manual
3-12
Indoor Unit Verification
To verify the correct operation of the indoor equipment, examine the
LED indicators located on the top panel of the IDU units.
Error! Reference source not found. lists the LEDs of the IDU and their
associated indications.
Table 3-6: IDU Indoor Unit LEDs
Name Description Functionality
POWER Power Indication
Green - 48VDC is present on the RADIO
port.
Off - No power is supplied to the RADIO
port.
LINK Self test and end-to-
end Ethernet
connectivity
Off – No Ethernet connectivity has been
detected between the outdoor unit and the
device connected to the indoor unit.
Orange– Self-test passed and Ethernet
connection confirmed by the outdoor unit
(Ethernet integrity check passed).
Verifying the Ethernet Connection
Once you have connected the unit to an Ethernet outlet, verify that the
Ethernet Integrity Indicator, which is the yellow LED embedded in the
10/100 BaseT connector, is On. This indicates that the unit is
connected to an Ethernet segment. The Ethernet Activity Indicator,
which is the green embedded LED, should blink whenever the unit
receives or transmits traffic on the 10/100 BaseT port.
Verifying Data Connectivity
To verify data connectivity, from the end-user’s PC or from a portable
PC connected to the unit, ping the other unit or a station behind it.