Installation Manual

Basic Installation
BreezeACCESS MMDS Series 6 SU-R Installation Manual
2.5 Wall Mounting the Unit
Note:
To avoid
drilling unnecessary holes, it is recommended to verify connectivity with the base
station prior to drilling holes in the locations intended for the SU-R unit and/or the indoor
antenna.
The drill template on the packaging box can be used to mark the locations of the screws on the
wall (drill right through the markings on the drill template).
After insertion of the anchors and screws, hang-on the unit on the two screws with the bottom
panel (the side with the connectors) facing downward.
2.6 Connecting the Antenna
1.
Connect the special adapter to antenna port 1 (marked 1) on the side of the unit. Push the
adapter carefully into the hole using the alignment markings on the adapter and the unit, and
turn it 180 degrees to firmly lock it.
2.
Connect the antenna cable to the adapter. If you use a heavy cable, secure the cable so as to
prevent applying excessive force on the adapter and connector.
2.7 Connecting the Unit to the Power Supply and to the CPE
The unit operates on a power input of 5V DC, supplied by the power transformer included with
the unit.
1.
Plug the output jack of the power transformer into the DC input jack (marked DC IN)
located on the bottom panel of the unit.
2.
Connect the supplied universal power transformer to a power outlet - 110/ 220VAC.
3.
Use a straight Ethernet 10BaseT cable to connect the Ethernet port (marked ETH) to a PC or
to a hub’s uplink port. Use a crossed cable to connect to a hub.
4.
For units with voice support, use the standard cable connected to the telephone set to
connect the telephone to the telephone port (marked TEL).