User's Manual

Basic Installation
SU-R Installation Manual 3 BreezeACCESS II Series
2.3 Installation Overview
Standard installation involves the following steps:
1.
Verify that all components of the packing list, described in Section 2.1, are intact and verify
availability of the required items listed in Section 2.2.
2.
Install the unit and antenna in optimal locations as described in Sections 2.4 and 2.5 and in
the instructions supplied with the antenna.
Note:
To avoid
drilling unnecessary holes, it is recommended to verify good connectivity with the
base station prior to drilling holes in the locations intended for the SU-R unit and/or the
detached antenna.
3.
Connect the antenna to the unit as described in Section 2.6.
4.
Connect the power supply and the user’s equipment to the unit as described in Section 2.7.
5.
Configure the basic system parameters as described in Section 3.
6.
Align the antenna for optimal connectivity (A7 models) and configure the Maximum Data
Rate if applicable, as described in Chapters 4 and 5.
7.
Check the functionality of the unit as described in Chapter 6.
2.4 Installation Guidelines
This section describes the installation guidelines and the various considerations that must be
taken into account when planning the installation.
2.4.1 Location of the Unit
The unit can be placed on a desktop or a shelf, or can be attached to a wall.
The unit should be installed as neat as possible to the antenna (-A7 models). The RF cable
connecting the unit to the antenna should be as short as possible to guarantee minimum power
loss.