User's Manual

Basic Installation
BreezeACCESS MMDS Series 13 BS Equipment Installation Manual
2.6.4 Shelf and Modules Installation Procedure
1. Install the BS-SH rack in a 19” cabinet (or place on an appropriate
shelf/table). When mounted the BS-SH on a desktop, screw on the rubber
legs shipped with unit.
2. Carefully insert the BS-PS Power Supply and the BS-AU modules into their
intended slots and push firmly until they are securely locked; refer to
Section 2.6.1 for a description of the slot assignments. Close the captive
screws attached to each module. Place blank covers over all the unused slots.
3. Connect the IF cable(s) to the connector(s) marked IF located on the front
panel(s) of the BS-AU module(s) shown in Figure 2-5. The other side of the
IF cable is already connected to the outdoor unit.
4. Connect the DC power cord to the –48 DC In jack (marked –48V) located on
the front panel of the BS-PS power supply shown in Figure 2-6. If a
redundant power supply module is installed, connect a power cable to it as
well.
5. Connect the power cord(s) to the –48VDC power source. Connect the black
wire to the -48VDC contact of the power source. Connect the red wire to the
+ (Return) contact. Connect the shield to the Ground.
6. Switch the BS-PS power supplies to ON. Verify that all the power indicator
LEDs on the BS-PS front panel are ON. Refer to Table 2-3 for a description
of these LEDs.
7. Set the switches on the front panel of all BS-AU modules in the rack to ON.