User's Manual
Table Of Contents
- System Description
- Introducing BreezeACCESS 900
- Cell Extender
- Subscriber Unit
- BreezeCONFIG( ACCESS
- Specifications
- Installing the Cell Extender
- Installing the SU-I Subscriber Unit
- Set-up and Initialization
- Aligning the Cell Extender’s SU-RA Antenna
- Aligning the SU-I Subscriber Unit’s Antenna
- Verifying Proper Operation
- Flexible Hopping Definition Mode
Installing the Cell Extender
Figure 2-7: Preparing the Power Cord
To prepare the power cord:
1. Release the domed sealing nut and the special clip of the power cord
protective connector.
2. Push the ½ inch conduit over the power cable and through the
domed sealing nut until it reaches the end of the special clip.
Continue pushing it onto the ferrule, and then tighten the domed
sealing nut.
Preparing the Local Ethernet cable
This section is only for those requiring a local Ethernet connection.
Figure 2-8: Preparing the Local Ethernet Cable
Manual Revision 1.0 - Preliminary
2-11