User's Manual
Appendix B. Basic Parameters
Base Station Equipment Installation Manual 44 BreezeACCESS Series
Note
: The hopping frequencies are calculated for each sub-band
separately. Therefore, the hopping frequencies calculated for
two consecutive sub-bands may differ from the hopping
frequency calculated for a single “combined” band (e.g. the
result for the entries 3410-3420,3420-3420 may differ from
the results for the entry 3410-3430).
•
Hopping Sync
(Access Unit only) – Displays the current Hopping Sync
status of the unit and allows defining a new status. When several AUs that
use the same sub-bands and different Hopping Shifts are co-located, their
operation should be synchronized in terms of hopping sequence initialization
and timing. One unit must be specified as a Master Unit and all other units
must be specified as Slave units. Available options are:
⇒
Idle
– no synchronization (stand-alone operation)
⇒
Master
– The AU that serves as a Master unit providing
synchronization signals to the Slave units
⇒
Slave
– An AU that operates as a Slave