User's Manual
Basic Installation
BreezeACCESS Series 7 Base Station Equipment Installation Manual
2.5 Installing the Outdoor Radio Unit
2.5.1 Mounting the Outdoor Unit
The outdoor unit can be secured to the pole using one of the following options:
•
Special brackets and open-ended screws (supplied with each unit). There
are two pairs of screw holes on the rear of the unit, allowing use of the
brackets with various pole widths.
•
U-bolts - size A (inner installation holes, up to 2" pole).
•
U-bolt - size B (outside installation holes, up to 3" pole).
•
Metal bands (9/16" wide, minimum 12" long).
Figure 2-1 shows the locations of the U-bolt holes, band grooves and screw holes
on the rear side of the unit.
Figure 2-2 illustrates the method of installing an AU-RE unit on a pole using the
supplied brackets and open-ended screws. The installation of an AU-RA unit with
an integral antenna is very similar to the installation of an SU-RE unit.
Note:
Make sure to install the unit with the bottom panel (the panel with the IF
connector) facing downward.
Bracket Screw Holes
Grooves for Insertion of 9/16” Metal Band
Size B U-Bolt Holes (3” Pole)
Size A U-Bolt
Holes (2” Pole)
Figure 2-1. Holes/Grooves/Screw Holes