Chapter 3 - Commissioning Operation Verification
BreezeMAX PRO 5000 CPE 39 Product Manual
3.4 Operation Verification
To verify proper operation of the PRO CPE, examine the LED indicators on the IDU
(see Table 2-5) and the SAU (see Table 3-2).
To verify proper connection to the end-user's data equipment, examine the
Ethernet Integrity and Ethernet Activity LEDs of the Ethernet connectors.
To verify data connectivity, from the end-user's PC or from a portable PC
connected to the unit, ping a known device in the network, or connect to the
Internet.
NOTE
Verifying the correct operation of the ODU using the SAU LEDs is meaningful only after the
configuration and alignment processes are completed, and the unit is synchronized with a BS.