User Manual
Table Of Contents
- About This Manual
- Contents
- Chapter 1 - Product Description
- Chapter 2 - Hardware Installation
- Chapter 3 - Initial Configuration
- Chapter 4 - System Settings
- Chapter 5 - Unit Control
- Chapter 6 - Registration
- Chapter 7 - Base Station Scanning
- Chapter 8 - Radio Parameters
- Chapter 9 - ATPC
- Chapter 10 - Performance Monitor
- Chapter 11 - Service
- Chapter 12 - Management
- Chapter 13 - Logout
- Appendix A - Troubleshooting
- Appendix B - GNU License
- Glossary
Installation Steps
Extreme CPE Product Manual 23
2.4 Installation Steps
Before installing the BreezeMAX K2 CPE, verify that you have all the items listed
in the package checklist above. If any of the items are missing or damaged,
contact your local dealer. Also, be sure you have all the necessary tools and
cabling before installing the Extreme CPE.
Mount the ODU on a pole, mast, or tower using the mounting bracket.
Install the IDU indoors.
Connect the ODU-IDU Ethernet cable and a grounding wire to the ODU.
Align the ODU antenna with the base station.
CAUTION
Only the Extreme CPE ODU can be installed outdoors.
The BreezeMAX Extreme IDU power supply is an indoor unit and must not be installed outdoors.
ONLY experienced installation professionals who are familiar with local building and safety codes
and, wherever applicable, are licensed by the appropriate government regulatory authorities should
install outdoor antennas.
Failure to abide may void the BreezeMAX Extreme CPE product warranty and may expose the end
user or Service Provider to legal and financial liabilities. Alvarion and its resellers or distributors are
not liable for injury, damage or regulation violations associated with the installation of Outdoor
antennas.
Hardware installation of the Extreme CPE involves these steps: