User's Manual

Table Of Contents
Chapter 2 - Installation Installing the ODU of the CPE
BreezeMAX PRO 5000 CPE 13 Product Manual
2.1.1.2 Additional Installation Requirements
The following items are also required to install the ODU:
Double shielded Cat.5E outdoor ethernet cable with two RJ-45 connectors*
(90m) (see Section 2.1.3 for details on approved cables and maximum length),
and an RJ-45 connectors crimping tool.
For units that connect to external antenna: Antenna(s)* and RF cable* for
connecting the antenna to the ODU.
SAU* (SU Alignment Unit) for antenna alignment and status verification.
Grounding cable with an appropriate termination.
Installation tools and materials, including appropriate means (e.g. a 1" to 4"
pole) for installing the ODU (and antenna where applicable).
2.1.1.3 Optional Items
Tilt Pole Mounting kit*.
2.1.2 Guidelines for Positioning the ODU
This section provides key guidelines for selecting the optimal installation locations
for the ODU.
Select the optimal locations for the equipment using the following guidelines:
The ODU should be mounted on a 1"-4" pole. Its location should enable easy
access to the unit and its connectors for installation and testing.
The higher the placement of the ODU/antenna, the better the achievable link
quality.
The ODU/antenna should be installed to provide a direct, or near line of sight
with the BTS antenna(s). The ODU/antenna should be aligned to face the
general direction of the BTS.
NOTE
Items marked with an asterisk (*) are available from Alvarion.