User Manual
Table Of Contents
- BreezeMAX PRO 5000 CPE Product Manual
- About This Manual
- Contents
- Figures
- Tables
- Chapter 1 - Product Description
- Chapter 2 - Installation
- Chapter 3 - Commissioning
- Chapter 4 - Operation
- 4.1 Introduction to SU Management
- 4.2 Accessing the Web Configuration Server
- 4.3 Using the Web Configuration Server
- 4.4 Show All
- 4.5 Unit Control Parameters
- 4.6 Registration Parameters
- 4.7 BST/AU Parameters
- 4.8 Radio Parameters
- 4.9 ATPC Parameters
- 4.10 Performance Monitor
- 4.11 Service Parameters
- 4.12 Management Parameters
- 4.13 Logout
- 4.14 Parameters Summary
- Appendix A - Troubleshooting
- Glossary
Chapter 3 - Commissioning Operation Verification
BreezeMAX PRO 5000 CPE 39 Product Manual
3.4 Operation Verification
To verify proper operation of the PRO CPE, examine the LED indicators on the IDU
(see Table 2-5) and the SAU (see Table 3-2).
To verify proper connection to the end-user's data equipment, examine the
Ethernet Integrity and Ethernet Activity LEDs of the Ethernet connectors.
To verify data connectivity, from the end-user's PC or from a portable PC
connected to the unit, ping a known device in the network, or connect to the
Internet.
NOTE
Verifying the correct operation of the ODU using the SAU LEDs is meaningful only after the
configuration and alignment processes are completed, and the unit is synchronized with a BS.