User Manual
Table Of Contents
- BreezeMAX PRO 5000 CPE Product Manual
- About This Manual
- Contents
- Figures
- Tables
- Chapter 1 - Product Description
- Chapter 2 - Installation
- Chapter 3 - Commissioning
- Chapter 4 - Operation
- 4.1 Introduction to SU Management
- 4.2 Accessing the Web Configuration Server
- 4.3 Using the Web Configuration Server
- 4.4 Show All
- 4.5 Unit Control Parameters
- 4.6 Registration Parameters
- 4.7 BST/AU Parameters
- 4.8 Radio Parameters
- 4.9 ATPC Parameters
- 4.10 Performance Monitor
- 4.11 Service Parameters
- 4.12 Management Parameters
- 4.13 Logout
- 4.14 Parameters Summary
- Appendix A - Troubleshooting
- Glossary
Chapter 3 - Commissioning Aligning the PRO CPE’s Antenna
BreezeMAX PRO 5000 CPE 35 Product Manual
3.3 Aligning the PRO CPE’s Antenna
3.3.1 SU Alignment Unit (SAU)
The miniature SU Alignment Unit can be used during installation and testing to
support an easy process of antenna alignment and provide the ODU's status
indications.
1 Remove the sealing cap of the ODU's SAU connector.
2 Connect the cable attached to the SAU to the SAU connector.
3 After completing the installation, disconnect the cable and replace the cap.
Use appropriate sealing material to protect the connection against moisture and
humidity. Use removable sealing material, such as a tar seal, to enable future
access to the connector.
To connect the SAU to the ODU:
Figure 3-2: SAU