User Manual
Table Of Contents
- BreezeMAX PRO 5000 CPE Product Manual
- About This Manual
- Contents
- Figures
- Tables
- Chapter 1 - Product Description
- Chapter 2 - Installation
- Chapter 3 - Commissioning
- Chapter 4 - Operation
- 4.1 Introduction to SU Management
- 4.2 Accessing the Web Configuration Server
- 4.3 Using the Web Configuration Server
- 4.4 Show All
- 4.5 Unit Control Parameters
- 4.6 Registration Parameters
- 4.7 BST/AU Parameters
- 4.8 Radio Parameters
- 4.9 ATPC Parameters
- 4.10 Performance Monitor
- 4.11 Service Parameters
- 4.12 Management Parameters
- 4.13 Logout
- 4.14 Parameters Summary
- Appendix A - Troubleshooting
- Glossary
Chapter 2 - Installation Installing the ODU of the PRO CPE
BreezeMAX PRO 5000 CPE 22 Product Manual
7 Connect the Ethernet cable to the IDU COM RJ-45 connector and tighten the
sealing cap.
8 Route the cable to the location selected for the indoor equipment.
9 Assemble an RJ-45 connector with a protective cover on the indoor end of the
IDU-ODU cable. Refer to the pin assignment and color codes in standard
cables described above.
Figure 2-6: Inserting the IDU COM Cable into the Sealing Cap
Seal
Housing GasketSealing nut