User Manual
Table Of Contents
- BreezeMAX PRO 5000 CPE Product Manual
- About This Manual
- Contents
- Figures
- Tables
- Chapter 1 - Product Description
- Chapter 2 - Installation
- Chapter 3 - Commissioning
- Chapter 4 - Operation
- 4.1 Introduction to SU Management
- 4.2 Accessing the Web Configuration Server
- 4.3 Using the Web Configuration Server
- 4.4 Show All
- 4.5 Unit Control Parameters
- 4.6 Registration Parameters
- 4.7 BST/AU Parameters
- 4.8 Radio Parameters
- 4.9 ATPC Parameters
- 4.10 Performance Monitor
- 4.11 Service Parameters
- 4.12 Management Parameters
- 4.13 Logout
- 4.14 Parameters Summary
- Appendix A - Troubleshooting
- Glossary
Chapter 2 - Installation Installing the ODU of the PRO CPE
BreezeMAX PRO 5000 CPE 19 Product Manual
2.1.5 Connectors
2.1.6 Connecting the Cables
2.1.6.1 Connecting the Grounding Cable
The Grounding screw (marked ) is located on the back panel of the ODU (see
Figure 2-1).
1 Connect one end of a grounding cable to the grounding screw and tighten the
grounding screw firmly.
2 Connect the other end of the grounding cable to a good ground (earth)
connection.
Figure 2-4: Bottom Panel of the ODU (without sealing covers)
Table 2-2: CPE-ODU-PRO Connectors
Name Connector Functionality
IDU COM 10/100Base-T (RJ-45) Connection to the IDU
SAU Special mini USB Connection to SAU
To connect the grounding cable:
IDU COM
SAU Port