User's Manual

Table Of Contents
Chapter 2 - Installation BTS Installation
BreezeMAX Extreme 39 System Manual
2.2.2 Assembling the Tilt Bracket on the BTS
The tilt bracket is attached and fastened to the BTS and then hung on the
carriage. After hanging the BTS on the carriage, tilt and rotate the BTS as required
before fastening the screws. The Tilt Bracket supports +7.5°/-10° tilting and ±45°
vertical plane rotation. The BTS has to be vertical to the ground.
NOTE
Install the unit with the bottom panel, including the LEDs, facing downward. Note the direction
arrows (UP) on the sides of the BTS.
CAUTION
The weight of BTS is 10.7 Kg and the weight of the Pole Mounting Kit is approximately 5 kg. Be sure
to plan the installation accordingly. It is recommended to use the supplied carrying hook (see
Figure 2-4) and a harness to lift the units.
Install the unit using the supplied kit only.
Figure 2-4: Carrying Hook
Hook
Holes for using
the hook