User's Manual
Installation
BreezeNET BU-DS.11/RB-DS.11 2-21 User’s Guide
Note: If the power cord supplied with the unit is open ended, connect to it a power plug
appropriate to the country in which the unit is being installed. The color codes of
the cable are:
brown phase ~
blue neutral 0
yellow/green grounding
The operating AC mains voltage of the Indoor unit is marked on the rear panel of the
unit.
3. After connecting the Outdoor unit to the Indoor unit using the Indoor-to-Outdoor
cable, connect the power cord to the unit’s AC outlet, located on the rear panel
shown in Figure 2-7. Connect the other end of the power cord to the AC mains.
100-120VAC
207-253VAC 250mA
500mA
Figure 2-7. Indoor Unit Rear Panel
4. Verify that the POWER LED located on the rear panel lights Green, indicating
that the unit self-test passed and that 48 VDC output to the Outdoor unit is not
shorted.
10-BASE-T
RADIO
RESET
LINK
POWER
Figure 2-8. Indoor Unit Front Panel