User's Manual
Table Of Contents
- 1 Introduction
- 2 The Concept
- 3 BreezeCELL Architecture
- 4 BreezeCELL Network Elements
- 5 Frequency Allocations
- 6 MIMO Support
- 7 Monitoring & Control
- 8 Installation Requirements and Procedures
- 9 Headend Equipment Installation
- 9.1 Connector Information
- 9.2 Rack Installation
- 9.3 Connecting the BreezeCELL Equipment
- 9.4 Connecting the Monitoring System
- 9.5 Connecting External Alarms
- 9.6 Connecting the Base Stations
- 9.7 UDC Configuration
- 9.8 Pilot Master/Slave Configuration
- 9.9 Measurements
- 9.10 Connecting to the Coax TV Networks
- 9.11 Measurements
- 9.12 Localized Testing Port
- 9.13 Determining BTS Output Power VS. Remote Unit Output Power
- 10 Coax Network Amplifier Installation (if applicable)
- 11 Remote Unit Installation
- 12 Preparing for Remote Unit Installation
- 13 Normal Operations
- 14 Acceptance Testing
In-building Cellular Solution for Commercial Buildings Contents
BreezeCELL
v
9.9 Measurements .................................................................................................................... 14
9.10 Connecting to the Coax TV Networks ........................................................................... 14
9.11 Measurements ................................................................................................................. 15
9.12 Localized Testing Port ..................................................................................................... 15
9.13 Determining BTS Output Power VS. Remote Unit Output Power .............................. 15
10 Coax Network Amplifier Installation (if applicable) ..................................16
10.1 Connections ..................................................................................................................... 16
10.2 Testing and Measurements ............................................................................................ 17
11 Remote Unit Installation ..............................................................................17
11.1 Remote Unit Registration ............................................................................................... 17
11.2 Remote Unit Connection (if Applicable) ....................................................................... 17
11.3 Remote Unit Installation Kit ........................................................................................... 17
11.4 Installation and Testing Procedure ................................................................................ 18
11.5 Remote Unit Configuration ............................................................................................ 19
11.6 Normal Operation ........................................................................................................... 19
11.7 Recommended Measurements....................................................................................... 19
11.7.1 Testing the First Remote Units ........................................................................................ 19
11.7.2 Standard Remote Unit Testing ........................................................................................ 19
12 Preparing for Remote Unit Installation .......................................................19
12.1 Logging into the Monitoring System ............................................................................ 19
12.2 Configuring a Global Parameter Set (GPS) ................................................................... 20
12.2.1 Adding a GPS ................................................................................................................. 20
12.2.2 Deleting a GPS ............................................................................................................... 21
12.3 Adding and Registering a New Remote Unit ............................................................... 21
12.4 Installing a Remote Unit ................................................................................................. 22