User's Manual

4Motion Installation Manual
30
Chapter 2 - BreezeCOMPACT Installation Unpacking and Inspecting
2.2.1 Package Content
BTS (weight: 9 kg)
Mounting kit (for 1''-4'' poles) including:
» 4 x heavy duty metal clamps
» 4 x M8 threaded rods
» 4 x M8x22 Hex screws
» 8 x M8 nuts
» 8 x M8 flat washers
» 8 x M8 spring washers
Sealing gland wrench
For poles up to 6'' - an additional kit containing 4 metal bands (ordered separately)
For poles larger than 6” and for wall mount - two large heavy duty metal clamps (ordered separately)
2.2.2 Additional Installation Requirements
The following items are also required to install the BTS:
Power Supply: High power AC/DC Power Supply unit and DC power cable* (available in various
lengths)
Power cable*: a 250m power cable drum. 6-pin mini-fit (manufactured by Samtek), DC in -40 to
-60VDC at connector input.
Ethernet cable*: a 250m CAT5e cable drum (connectors not included)
Optical fiber cable*: 10/100/1000BASE-T Optic SFP (small form-factor pluggable) shielded
Antenna(s)* and RF cable(s)* for connecting the antenna(s) to the BTS. (applicable for units without
integral antennas). External antennas are connected via LMR-400 1m / 0.5m cables.
Grounding 10 AWG cable with an appropriate termination
GPS Antenna kit including mounting kit, 3m cable, and one lightning arrestor
Hook for carrying the assembly up the pole
Installation tools and materials
INFORMATION
Items marked with an asterisk (*) are available from Alvarion.