User's Manual
Table Of Contents
- BreezeMAX CPEs Product Manual
- About This Manual
- Contents
- Figures
- Tables
- Chapter 1 - Products Description
- Chapter 2 - Installation
- 2.1 Installing the ODU of the PRO-S CPE
- 2.2 Installing the IDU-1D Indoor Unit of the PRO-S CPE
- 2.3 Installing the Si CPE
- 2.4 Installing the 3.5 GHz Detached Antenna
- 2.5 Installing the 2.3/2.5 GHz Detached Antenna
- Chapter 3 - Commissioning
- Chapter 4 - Operation
- 4.1 The SU Installer Monitor Program
- 4.2 Using the Monitor Program
- 4.3 The Main Menu
- 4.4 Unit Control Menu
- 4.5 Registration Parameters Menu
- 4.6 BST/AU ID Parameters Menu
- 4.7 ˘Radio Parameters Menu
- 4.8 Performance Monitoring Menu
- 4.9 Multirate and ATPC Parameters Menu
- 4.10 ˘SU Parameters Summary
- Appendix A - The Web Configuration Server
- Appendix B - Troubleshooting
- Glossary
BreezeMAX CPEs Product Manual xi
Contents
2.4.3 Window Mounting the 3.5 GHz Detached Antenna, with Rotation Capability....49
2.4.4 Wall Mounting the 3.5 GHz Detached Antenna, with Tilt & Pan Capabilities.....51
2.5 Installing the 2.3/2.5 GHz Detached Antenna ...........................................................53
2.5.1 Wall Mounting the 2.3/2.5 GHz Detached Antenna ...........................................53
2.5.2 Window Mounting the 2.3/2.5 GHz Detached Antenna, with Rotation Capability..
55
Chapter 3 - Commissioning
3.1 Commissioning Steps.................................................................................................58
3.2 Configuring Basic Parameters...................................................................................59
3.2.1 The Basic Parameters........................................................................................59
3.2.2 Configuration Tools............................................................................................60
3.2.3 Using the Configuration Tools............................................................................60
3.3 Aligning the PRO-S CPE’s Antenna ..........................................................................62
3.3.1 Fast Configuration and Antenna Alignment (PRO-S CPE) ................................62
3.3.2 SU Alignment Unit (SAU)...................................................................................63
3.3.3 Using SAU for Aligning the PRO-S CPE's Antenna...........................................65
3.4 Aligning the Si CPE's Antenna...................................................................................67
3.5 Operation Verification.................................................................................................69
Chapter 4 - Operation
4.1 The SU Installer Monitor Program.............................................................................72
4.2 Using the Monitor Program........................................................................................73
4.2.1 Accessing the Monitor Program.........................................................................73
4.2.2 Using the Program .............................................................................................73
4.3 The Main Menu ............................................................................................................75
4.3.1 Show all Parameters and Status........................................................................75
4.3.2 Unit Control ........................................................................................................75