User Manual
Chapter 2 - Installation Installing the ODU
4Motion 54 System Manual
2.1.4.9 Pole Mounting Two ODUs
1 Prepare the two ODUs for installation as shown in Figure 2-4.
2 Position both carriages at the desired location on the pole.
3 Thread the 4 M10x265 threaded rods through one carriage and tighten using
the supplied washers, spring washers and nuts. Lean the carriage vertically on
the pole and thread the rods through the second carriage (Figure 2-8).
4 Tighten using the washers, spring washers and nuts.
Figure 2-7: 4x2 ODU Mounted on Pole