User Manual
Chapter 2 - Installation Installing the ODU
4Motion 52 System Manual
Sun guard requirements: For 3.5 GHz 4x2 ODU, installing a Sun guard is
mandatory.
2.1.4.8 Pole Mounting One ODU
1 Open the packaging and remove the ODU and screws.
2 Insert the four M10X30 screws into the designated holes (Figure 2-4).
3 Position the carriage on the pole at the desired location.
4 Thread the four M10x265 threaded rods through the carriage and the rear
clamps (Figure 2-5).
5 Tighten on both sides using the supplied washers, spring washers and nuts.
Figure 2-4: Preparing the 4x2 ODU for Installation
ODU
M10x30 screws