Chapter 2 - Installation
2.3 Installing the Base Transceiver Station
(BTS) Equipment
2.3.1 BTS Installation Requirements
2.3.1.1 Packing List
BTS Chassis:
» Base Transceiver Station Chassis
» AVU Air Ventilation Unit (installed)
» Cables Tray kit
PIU (1 or 2 per chassis) High-Power Interface Unit(s). A suitable DC power
cable is supplied with each PIU.
PSU (up to 4 per chassis) Power Supply Unit(s)
NPU Network Processing Unit and Monitor cable
AU-4CH Access Unit Indoor Unit(s) as required for specific configuration
2.3.1.2 Additional Installation Requirements
The following items are also required to install the BTS:
Ethernet cable (straight) for connecting the NPU to a Hub/Switch.
A grounding cable with appropriate terminations for connecting the chassis to
the rack or another ground (earth) connection.
For installation in a 21" ETSI rack: Two 21" ETSI rack adapters
A portable PC for configuring parameters using the Monitor cable (supplied
with the NPU)
NOTE
The maximum length of the Ethernet cable is 100m when operating at 100 Mbps and 70m when
operating at 1 Gbps.