Installation Guide

Access Unit Installation Guide Configuring System Parameters
BreezeCOM 19
6.6 Initial Operation
After completing the installation as described above, and after connecting the
Indoor unit to the AC Mains, the system starts operation. To verify correct
operation, view the LED panel located on the bottom panel of the Outdoor unit, as
shown in Figure 13.
L
M
H
ETH
WLNK
PWR
Figure 13. Outdoor Unit LEDs
Table 1 lists the various LED states.
Table 1. Outdoor Unit LEDs
Name Description Functionality
PWR Power supply On – After successful power up
Off – Power off
WLNK Not used
ETH Ethernet activity Blinking – Reception of data from Ethernet LAN
Off – No reception of data from Ethernet LAN
LOAD Active subscriber
units no subscribers
1-8 subscribers
9-16 subscribers
17 or more subscribers