Installation Guide
- 6 - TSH Kits
T3SK75F8 or T3SK75F16: Configuration of Software House iSTAR Pro Boards
1. Align the Software House boards on the backplane to match the boards’ mounting holes with pems provided.
2. Fasten provided standoffs to pems that match the hole pattern for Software House iSTAR Pro GCM, iSTAR ACM SE/PRO ACM,
and /or I8, R8, I8-CSI boards (Fig. 5, 5a, pg. 6).
3. Mount Software House boards to standoffs utilizing provided 5/16” pan head screws (Fig. 5a, pg. 6).
Note: Software House iSTAR ACM SE/PRO ACM boards have one (1) USB port each.
Please orient the board in the appropriate position according to the Fig. 5 below.
4. Fasten backplane to Trove3 enclosure utilizing lock nuts (provided).
Software House
I8, R8 or I8-CSI
Module
Software House
iSTAR
Pro GCM
USB PORT
Software House
iSTAR
ACM SE/PRO ACM
USB PORT
Software House
iSTAR
ACM SE/PRO ACM
Software House
I8, R8 or I8-CSI
Module
Altronix
eFlow104NB
Altronix
eFlow102NB
Altronix
ACM8
Altronix PD8UL
(T3SK75F8)
Altronix PD8UL
(T3SK75F16)
Altronix ACM8
(T3SK75F16)
RSB2 Bracket
Rocker Switch
Pem
Standoff
Power Supply or
Sub-Assembly
Backplane
Pan Head
Screw
Fig. 5a
Fig. 5