User guide
4
4.0 INSTALLATION - GENERAL
Care must be taken when handling and connecting the boiler not to damage or stress it in any way. Prior
to installation the boiler must be stored in a dry, safe place.
The boiler must be mounted in an UPRIGHT position. The boiler must be xed to a wall before connecting
pipework. When choosing the position for the boiler, ensure sufcient clearances to house the unit and for
servicing. 50mm minimum clearance each side of the boiler is required. A drain valve at the base of the
boiler is strongly recommended. It must be sited in a dry, ventilated position, frost free and not subjected
to extremes of temperature.
Note. Before connecting the pipework, ensure the rubber seal at the top of the boiler is rmly in place; check
it has not become loose in transit. The warranty will be invalid if water leaks into the boiler.
TOP
HAUT ALTO
OBEN
WARNING
Before obtaining access to terminals all supply
circuits must be disconnected
Do not solder directly onto flow and return pipework
The guarantee will be withdrawn if this produc t is
N
ot installed in a ccordance with the i nstallation
instructions
Electroheat
AMPTEC
AMPTEC BOILER C600
GC NO. EB-205-02
OPERATING TEMPERATURE 65-80C
PRESSURE 3 BAR MAX
220-240V ~ 5 -6KW
BEAB
CE N C CA
COPYRIGHT RE SE RVED P ATENT APPLIED
FOR
Electroheat
Basingsto ke UK RG24 9RA
BOTTOM
BAS
BASSO U NTEN
FIGURE TWO: DIMENSIONS
BACK VIEW
FRONT VIEW
SIDE VIEW
ENTRY PORTS
SUPPLY AND
CONTROL ON
BOTH SIDES
20mm
25.4mm
FLOW PIPEWORK
RED IDENT
RETURN PIPEWORK
5mm SECURING
HOLE
900mm FIXING CENTRES
30mm
1050mm
20mm
30mm
100mm
90mm










