5.  The pump is operated from the boiler control.  It should be connected to the pump terminals on the 
boiler control board. The pump will run whenever the CALL indicator is illuminated (green) either 
ashing or steady, and it will also continue to run if the boiler is hot, even after the demand has 
ceased.  It will turn off the pump when the boiler temperature falls below approximately 75
0
C.  It will 
also turn the pump back on if the water temperature rises above 75
0
C again.   A bypass must be 
incorporated in systems where the heating load can shut down, i.e.  when valves or thermostatic 
radiator valves are tted. See note on the bypass (page 5).
6.  The ALARM indicator ashing (red) will only illuminate if there is a problem.  If there is a water 
problem the HEAT and the CALL (green) indicators will turn off.  The boiler will remain in this tripped 
state until the fault is corrected and the boiler is re-set.
7.  An ALARM  indicator  ashing(red)  together  with  the  CALL  indicator  (red)  indicates  an  over 
temperature problem. 
NO CONNECTION
PUMP SUPPLY CABLE
0.5mm - 1mm 
MAINS SUPPLY CABLE
BOILER CONTROL CABLE
0.5mm - 1mm
SUPPORT BACK 
OF PCB WHEN 
TIGHTENING SCREWS
ENSURE SCREWS
ARE TIGHT.
LOOSE CABLE
CONNECTIONS
CAN CAUSE A
FIRE
SUPPLY
CONN 5
CONN 1
FS 1 2A 240V
(5 X 20mm)
REMOVE TOP COVER 
ONLY TO GAIN ACCESS 
TO THE CONNECTIONS 
ON THE PRINTED 
CIRCUIT BOARD 
INSIDE THE BOILER 
HOUSING
LIVE
EARTH
NEUTRAL
LIVE
EARTH
NEUTRAL
RUN
NEUTRAL
N
L
CONTROL
PUMP
CONTROL
PUMP
NC N R E N L
NC N R E N L
CASE EARTH
INITIAL TEST SET UP
REMOVE PUMP LIVE AND PUMP 
NEUTRAL WIRES FROM CONN1 BLOCK.
RECONNECT PUMP LIVE TO RUN WIRE.
RECONNECT PUMP NEUTRAL TO 
NEUTRAL.
UNPLUG CONN1 BLOCK FROM PCB.
ENSURE IT IS SAFE BEFORE CARRYING 
OUT TEST.
POWER UP SYSTEM WITH ALL 
CONTROLS SET TO RUN.
ENSURE THE BOILER SUPPLY LIGHT IS 
ON, CALL LIGHT IS OFF AND PUMP 
IS RUNNING.
THIS COMPLETES THE TEST.
SWITCH OFF ALL POWER TO BOILER 
AND RECONNECT PUMP NEUTRAL 
AND PUMP LIVE WIRES BACK TO 
THEIR ORIGINAL POSITIONS.
PLUG THE TERMINAL BLOCK
BACK INTO CONN1 ON THE PCB.
ENSURE CONNECTION SCREWS ARE 
TIGHT
2
2
2 2
FIGURE THIRTEEN: INITIAL TEST SET UP