Operating instructions

#828 Operation and Care Manual 4.
INSTALLATION
Site Installation
24-1/4"
(616mm)
1-1/4"
(32mm)
37-13/16"
(960mm)
29-3/4"(756mm)
3-1/2"
(89mm)
CORD LOCATION
28-15/16"
(735mm)
WITH DOORS OPEN
52-3/4"
(1340mm)
1-3/8"
(35mm)
3/4"
(19mm)
6-3/4" (171mm)
FOR CASTERS
OR LEGS
ALTO-SHAAM
30-3/4"(781mm)
Outside Dimensions
OPTIONS & ACCESSORIES
Casters, 5" (127mm) 4007
Legs, 6" (152mm) 5205
Stacking Hardware 14209
Wire Pan Grid PN-2115
18" x 26" Sheet Pan Insert
Wire Shelves
Reach-in SH-2851
Pass-through SH-2114