User's Manual
Table Of Contents
- Altiostar Networks iRM4451nn00-2 intelligent Remote Radio Head
- Preface
- Contents
- List of tables
- List of figures
- 1 Introduction
- 2 Safety requirements
- 3 Physical description
- 4 Installation prerequisites
- 5 Installation overview
- 6 Installing the iRM4451nn00-2
- 6.1 Assembling cables
- 6.2 Routing pre-assembled power/GigE optical fronthaul/grounding cables
- 6.3 Installing the mounting bracket
- 6.4 Hoisting the iRM4451nn00-2 on elevated structures
- 6.5 Installing the iRM4451nn00-2 on the mounting bracket
- 6.6 Connecting the grounding cable
- 6.7 Connecting the RET cables
- 6.8 Connecting the GigE optical fronthaul cables
- 6.9 Connecting the RF cables
- 6.10 Connecting the alarms cable
- 6.11 Connecting the –48 V dc power cable
- 6.12 Weatherproofing cable connections
- 6.13 Checking power
- 7 Terms, Acronyms and Abbreviations
Installation prerequisites
4-2 iRM4451nn00-2 iRRH Product Description and Installation Guide
Cordless electric
screwdriver
Cable tie tool
Nylon bridle sling, 2-
leg, 2 in (5.1 mm)
straps, 6×19 EIPS, or
equivalent
Pulley-minimum
load-bearing
capacity 880 lb (400
kg)
Punch Wire stripper
Rope - minimum
breaking strength
600 lb (272 kg)
Self-amalgamating
waterproofing tape
(e.g., Commscope
Miracle Tape,
Huber+Suhner Fast-
Wrap, RFS CELL-
Tape, EasyWrap®
tape, etc.)
Spirit level Tape measure
Assorted hook & loop
fasteners (for fiber
optic cables) and cable
ties (for all other
applications)
Torque wrench for
7/16 conn, 32 mm,
211 in-lb
(25 Nm)
Required Tools