User's Manual
Table Of Contents
- Altiostar Networks iRM4451nn00-2 intelligent Remote Radio Head
- Preface
- Contents
- List of tables
- List of figures
- 1 Introduction
- 2 Safety requirements
- 3 Physical description
- 4 Installation prerequisites
- 5 Installation overview
- 6 Installing the iRM4451nn00-2
- 6.1 Assembling cables
- 6.2 Routing pre-assembled power/GigE optical fronthaul/grounding cables
- 6.3 Installing the mounting bracket
- 6.4 Hoisting the iRM4451nn00-2 on elevated structures
- 6.5 Installing the iRM4451nn00-2 on the mounting bracket
- 6.6 Connecting the grounding cable
- 6.7 Connecting the RET cables
- 6.8 Connecting the GigE optical fronthaul cables
- 6.9 Connecting the RF cables
- 6.10 Connecting the alarms cable
- 6.11 Connecting the –48 V dc power cable
- 6.12 Weatherproofing cable connections
- 6.13 Checking power
- 7 Terms, Acronyms and Abbreviations
iRM4451nn00-2 iRRH Product Description and Installation Guide
Copyright
© 2017 Altiostar Networks, Inc. All rights reserved. No part of this document may be
reproduced in any form without the written permission of the copyright owner. Altiostar
Networks, iR6, and the Altiostar Networks, Inc. logo are trademarks of Altiostar Networks,
Inc. All other trademarks are the property of their respective owners.
Disclaimer
All rights reserved. Information and product specification are subject to change without
notice as part of the company continuous process and methodology improvement. Altiostar
Networks assumes no responsibility for inaccuracies contained herein.