Installation Guide
Table Of Contents
- Preface
- Contents
- 1 Introduction
- 2 Safety requirements
- 3 Physical description
- 4 Installation prerequisites
- 6 Installing the iRM4451
- 6.1 Assembling cables
- 6.2 Routing pre-assembled power/GigE optical fronthaul/grounding cables
- 6.3 Installing the iRM4451 mounting bracket
- 6.4 Hoisting the iRM4451 on elevated structures
- 6.5 Installing the iRM4451 on the mounting bracket
- 6.6 Connecting the grounding cable
- 6.1 Connecting the RET cables
- 6.1 Connecting the GigE optical fronthaul cables
- 6.1 Connecting the –48 V dc power cable
- 6.2 Checking power
- 6.3 Installing the solar shield
- 7 Terms, Acronyms and Abbreviations
- 5 iRM4451 installation overview
Installation prerequisites
4-4 iRM4451 RRH Product Description and Installation Guide
4.5 Site installation checklist
Verify site conditions required for the installation of the iRM4451 are known. In
addition, the site must be prepared by the Operator in accordance with the Site
Installation Guide provided by the Operator which must include, at a minimum, the
required tasks in Table 4-8.
11
Verify main power supply is properly installed and tested and capable of supplying the
required –48V dc voltage and current for proper operation of the iRM4451 system to
within ±20% of rated output.
12
Verify –48V dc power cable to the iRM4451 is labeled and tested as specified in the
Site Installation Plan.
13
Verify recommended size breakers/fuses for the external power source is properly
installed and capable of protecting the–48V dc power to the unit.
14
Verify earth ground bonding point, for connection of the grounding cable to the
iRM4451 , is correctly installed, labeled and tested as specified in the Site Installation
Plan.
15
Determine a safe method to hoist and secure iiRM4451 RRH into position on selected
structure and enter into Site Installation Plan.
16
Verify proper in-line surge protectors are installed, where required, on power and RET
cables as specified in the Site Installation Plan.
17
Verify that the Operator, Altiostar Networks and all other affected parties are in
agreement with the equipment installation location, power source, and grounding
location, to meet the installation checklist requirements.
Item
Site pre-installation visit checklist Check
Table 4-8 Site installation checklist
Item Site installation checklist Check
1
Verify Site Installation Plan and installation documentation is available.
2
Verify health and safety documentation specified by the Operator and Altiostar
Networks are understood and installation personnel are trained accordingly.
3
Know locations of fire equipment, eyewash stations, and evacuation procedures posted
for fire/halon discharge.
4
Know locations of first aid and emergency equipment and installation personnel are
familiar with their operation and use.
5
Verify site authorizations, clearances, and releases from Operator and local authorities
are complete.
6
Verify emergency telephone numbers are posted for fire, police, and ambulance/
medical aid.
7
Verify Operator and local authorities contact and phone numbers are posted.
8
Verify installation schedule is approved.