Installation Guide
Table Of Contents
- Preface
- Contents
- 1 Introduction
- 2 Safety requirements
- 3 Physical description
- 4 Installation prerequisites
- 6 Installing the iRM4451
- 6.1 Assembling cables
- 6.2 Routing pre-assembled power/GigE optical fronthaul/grounding cables
- 6.3 Installing the iRM4451 mounting bracket
- 6.4 Hoisting the iRM4451 on elevated structures
- 6.5 Installing the iRM4451 on the mounting bracket
- 6.6 Connecting the grounding cable
- 6.1 Connecting the RET cables
- 6.1 Connecting the GigE optical fronthaul cables
- 6.1 Connecting the –48 V dc power cable
- 6.2 Checking power
- 6.3 Installing the solar shield
- 7 Terms, Acronyms and Abbreviations
- 5 iRM4451 installation overview
Installation prerequisites
4-2 iRM4451 RRH Product Description and Installation Guide
4.2 Additonal required site equipment
This section describes the additional interconnecting equipment required for the
installation of the Altiostar Networks iRM4451. These are essentially cables,
connectors and fixing arrangements. The specification of these items (specifically the
length of cables) may need to be customized on site.
Nylon bridle sling,
2-leg, 2 in (5.1 mm)
straps, 6x19 EIPS,
or equivalent
Pulley-minimum load-
bearing capacity 880 lb
(400 kg)
Punch Wire stripper
Rope - minimum
breaking strength 600
lb (272 kg)
(optional)
Self-amalgamating
waterproofing tape (e.g.,
Commscope Miracle
Tape, Huber+Suhner
Fast-Wrap, RFS CELL-
Tape, EasyWrap® tape,
etc.)
Spirit level
Tape measure
Assorted hook & loop
fasteners (for fiber
optic cables) and
cable ties (for all other
applications)
Torque wrench, 7/16,
29 mm head,
15–20 in-lb
(20–28 Nm)
McMaster eyebolts
(Model 3040T13)
M8x1.25, 16mm,
quantity 2 min.
Required Tools