User's Manual
Table Of Contents
- Preface
- Contents
- 1 Introduction
- 2 Safety requirements
- 3 Physical description
- 4 Installation prerequisites
- 6 Installing the iRM4451
- 6.1 Assembling cables
- 6.2 Routing pre-assembled power/GigE optical fronthaul/grounding cables
- 6.3 Installing the iRM4451 mounting bracket
- 6.4 Hoisting the iRM4451 on elevated structures
- 6.5 Installing the iRM4451 on the mounting bracket
- 6.6 Connecting the grounding cable
- 6.1 Connecting the RET cables
- 6.1 Connecting the GigE optical fronthaul cables
- 6.1 Connecting the –48 V dc power cable
- 6.2 Checking power
- 6.3 Installing the solar shield
- 7 Terms, Acronyms and Abbreviations
- 5 iRM4451 installation overview
Installing the iRM4451
iRM4451 RRH Product Description and Installation Guide 6-3
Figure 6-13 iRM4451 cable routing
2. Secure and dress all cables according to Operator local practice.
6.3 Installing the iRM4451 mounting bracket
This section provides the procedure for installing the iRM4451 on a mast/pole pipe, V-
angle or H-angle, or mounting on a wall.
The iRM4451 can be installed on a pole/mast structure having the following
dimensions using the supplied mounting bracket assembly:
Pole/mast:2.36-4.49 in (60-114 mm)
U-frame:1.97-3.94 in (50-100 mm)
V-frame:1.97-3.94 in (50-100 mm)