User's Manual
Table Of Contents
- Preface
- Contents
- 1 Introduction
- 2 Safety requirements
- 3 Physical description
- 4 Installation prerequisites
- 6 Installing the iRM4451
- 6.1 Assembling cables
- 6.2 Routing pre-assembled power/GigE optical fronthaul/grounding cables
- 6.3 Installing the iRM4451 mounting bracket
- 6.4 Hoisting the iRM4451 on elevated structures
- 6.5 Installing the iRM4451 on the mounting bracket
- 6.6 Connecting the grounding cable
- 6.1 Connecting the RET cables
- 6.1 Connecting the GigE optical fronthaul cables
- 6.1 Connecting the –48 V dc power cable
- 6.2 Checking power
- 6.3 Installing the solar shield
- 7 Terms, Acronyms and Abbreviations
- 5 iRM4451 installation overview
Revision Change
Rev 1.0 First issue
l
iRM4451 RRH Product Description and Installation Guide i
Preface
About the Manual
This document covers the basic installation of the Altiostar Networks, Inc., iRM4451 Remote
Radio Head (RRH) on towers, walls, roof or other structures utilizing a universal mounting
assembly.
Connections to external interfaces, including signaling, grounding, and power are described.
Descriptions of the iRM4451 macro-cellular remote radio head indicators are also provided.
Intended Users
The target audience for this document is installation and engineering personnel. It assumes
personnel have a basic understanding of wireless telecommunications terminology, and
experience in installing wireless telecommunications equipment.
Revision History
This section describes the changes made to each revision of this document.