- 5 Installing the iRU4438 iRRH
- 5.1 Assembling cables
- 5.2 Routing pre-assembled power/fronthaul Ethernet/grounding cables
- 5.3 Installing RF antennas on upper/lower omni-antenna brackets
- 5.4 Installing RF antenna cables
- 5.5 Installing the iRU4438 iRRH mounting bracket
- 5.6 Hoisting the iRU4438 iRRH on elevated structures
- 5.7 Installing the iRU4438 iRRH on the mounting bracket
- 5.8 Connecting the grounding cable
- 5.9 Connecting the fronthaul Ethernet cables
- 5.10 Connecting the 110/220 V ac power cable
- 5.11 Checking power
- 5.12 Installing the solar shield
- 6.13 Terms, Acronyms and Abbreviations
Installation prerequisites
3-2 iRU4438 iRRH Product Descripton and Installation Guide
3.2 Required site equipment
This section describes the additional interconnecting equipment required for the
installation of the Altiostar Networks iRU4438 iRRH. These are essentially cables,
connectors and fixing arrangements. The specification of these items (specifically the
length of cables) may need to be customized on site.
• Grounding cable connecting the iRU4438 iRRH to the grounding point is supplied
by the Operator and assembled on site unless otherwise specified. Altiostar
Networks provides the two-hole lug for crimping onto the cable.
• Power cable with plug connecting the iRU4438 iRRH to local 110/220 V ac power is
supplied by the Operator and assembled on site unless otherwise specified.
Caribiner (2)
(optional)
Pulley-minimum load-
bearing capacity 440 lb
(200 kg)
(optional)
Punch Wire stripper
Rope - minimum
220 lb (100 kg)
breaking strength
(optional)
Self-amalgamating
waterproofing tape (e.g.,
Commscope Miracle
Tape, Huber+Suhner
Fast-Wrap, RFS CELL-
Tape, EasyWrap® tape,
etc.)
Spirit level
Tape measure
Assorted cable ties
and hook & loop
fasteners
Required Tools