User guide

18 MaxInSight Manual
1. Choose Add > Add Gauge View.
2. Specify the workgroup, the field to track, and a value range.
Note: Only the fields appropriate to a gauge view are
available
3. Select a font and color for the workgroup and for the field
name.
4. Click OK. You see a gauge similar to the next figure:
Figure 3. Gauge view set to show % of abandoned calls, up to 16 calls