Specifications

Setting Up TAPIT and CDR Loader for Multiple Node (AltiGen)
88 CDR Manual
16. Click on the Close button.
17. Restart the SMDR Monitor application.
18. To test the connection, click on the Get Calls Now button. Keep in
mind if the CDR Loader application is running for the first time it
loads all (!) available call records.
19. Click on Start Timer to turn on the automatic mode.
20. Click on the OK button to minimize CDR Loader.
21. After SMDR Monitor loads call records, run reports to verify the
program works fine.
Setting Up TAPIT and CDR Loader for Multiple
Node (AltiGen)
Note: Each Node requires one location (the Main location can be used
too).
One node is set as the Main Location. All other nodes are set as
Remote Locations.
1. Open Remote Manager (Start/Tapit/Remote Manger).
2. If Remote Manager is opened for the first time, you need to create
locations (see the Remote Manager manual for instructions) otherwise
open each location to verify settings. Make sure the Remote Manager
settings follow the guidelines below.