Specifications
Table 8-8: EDERROR_INJECT instruction
DescriptionInstruction CodeJTAG Instruction
Use this instruction to inject errors into the
configuration data. This instruction controls the
JTAG fault injection register, which contains the
error you want to inject into the bitstream.
00 0001 0101
EDERROR_INJECT
You can only inject errors into the first frame of the configuration data. However, you can monitor the error
information at any time. Altera recommends that you reconfigure the FPGA after the test completes.
Automating the Testing Process
You can automate the testing process by creating a Jam
™
file (.jam). Using this file, you can verify the CRC
functionality in-system and on-the-fly without reconfiguring the device. You can then switch to the CRC
circuitry to check for real errors caused by an SEU.
Related Information
Test Methodology of Error Detection and Recovery using CRC in Altera FPGA Devices
Provides more information about how to test the error detection block.
Document Revision History
ChangesVersionDate
• Updated the CRC Calculation Time section to include a formula to
calculate the minimum and maximum time.
• Removed preliminary for the Minimum EMR Update Interval and CRC
Calculation Time.
• Removed related information for the Internal Scrubbing feature.
2013.11.12November 2013
• Added link to the known document issues in the Knowledge Base.
• Updated the minimum EMR Update Interval and CRC Calculation
Time for Cyclone V E, Cyclone V GX, and Cyclone V GT devices.
• Moved all links to the Related Information section of respective topics
for easy reference.
2013.05.06May 2013
• Updated the width of the JTAG fault injection and fault injection
registers.
2012.12.28December 2012
• Added the “Basic Description”, “Error Detection Features”, “Types of
Error Detection”, “Error Detection Components”, “Using the Error
Detection Feature”, and “Testing the Error Detection Block” sections.
• Updated Table 8–4, Table 8–5, and Table 8–6.
• Restructured the chapter.
2.0June 2012
Initial release.1.0October 2011
Altera Corporation
SEU Mitigation for Cyclone V Devices
Send Feedback
8-9
Document Revision History
CV-52008
2013.11.12