Instructions / Assembly
5
NOTE 2: FOR USE WITH TOGGLE ANCHORS E:
• If the finished wall surface has wood studs that are not 16” on center, has metal studs, or has an
underlying surface of concrete block, use ½” bit.
• Use Machine Screws (C) and Flat Washers (D) (See Figure B on page 6).
• For holes NOT located in a wood stud, Toggle Anchors (E) MUST be used (See Figure C on page 7).
See “Using Toggle Anchors” section.
STEP 6:
A. Align holes in Changing Station (1) with drilled holes and secure top left corner of Changing Station (1)
to wall stud using the appropriate screw and washer.
B. Continue to secure the three (3) remaining corners using the proper screws and washers as
described in NOTE 1 or NOTE 2.
STEP 7:
A. Ensure all four (4) screws are tight and snap the Caps (F) over the screw heads.
Installation Instructions
ALL 4 OF THESE LOCATIONS
MUST BE USED FOR SAFE
INSTALLATION. THE LOWER
HOLES ENSURE INSTALLATION
THROUGH THE METAL BRACKETS.
WARNING:
!