Product Manual

HAZEL
Hardwiring
Live/Hot wire
brown, or red
Neutral wire
black, blue, white, or gray
Ground wire
green, or yellow
INTALLING THE HAND DRYER UNIT
CAUTION: Make sure that no electrical wiring or pipe work is located directly
behind area of drilling.
Be sure there is no obstruction between floor and dryer. If mounted over counter
top place dryer no less than 16 inches above counter. Do not install dryer over
wash basin.
1. If hardwired, disconnect power source of electricity previously bought to the
hand dryer location.
2. Mark wall at appropriate mounting height according to height guide below.
Recommended Height Guide
From floor to bottom of dryer
Men
45”- 114 cm
Women
43”- 109 cm
Teens
42”- 107 cm
Young Children
34”- 86 cm
Handicapped
38”- 97 cm
3. Hold the template (supplied) against bare wall. Make sure that the line of
template representing bottom of dryer is horizontal. Mark 4 location of
screws.
4. Attach supporting plate to wall using 3 of the upper marked points.
5. Hook unit into supporting plate.
6. Secure dryer by affixing metal knob to wall at previously lowest marked
point.
7. Restore power and test for proper operation.