User`s guide
30
4. Operation
164201085 Rev. F0
This chapter explains the operation of the ZTT/Plus CATV UPS including startup and initial
test, the front panel, UPS operational modes, and how to use the LCD panel. After mounting
the cabinet and installing the UPS, perform the following steps to start up the ZTT/Plus.
TURN
UP
AND
TEST
PROCEDURE
1. If you have a 60V model, skip to step 3. If you have a 60/72/90V or 60/90V
model, continue to step 2.
2. For 60/72/90V and 60/90V Models Only. Select the output voltage by plugging
the output connector into the desired voltage source. The output connector is yellow
and is located towards the rear of the chassis. The voltage source connectors are
located towards the front of the chassis:
Red = 87 Vac White = 72 Vac Yellow = 60 Vac
Locate the proper source connector for your cable company voltage and plug it into the
yellow output connector.
NOTE:The connection for selecting output voltage is inside the ZTT/Plus chassis
along the main wire harness in the center of the chassis; it is accessible when
the inverter module is removed.
4.1 Startup and Initial Test
Figure 4-1
Output Voltage Selection ZTT/Plus 60/72/90V and 60/90V Models










