Operator`s manual

164201257 C0
Page 15 6/13/2003
Preliminary
Lectro CPR
®
Operator’s Manual
THE CPR SYSTEM IS NOW READY TO BE ENERGIZED. FOLLOW THE OPERATING
PROCEDURE IN SECTION 2.2.
Fig. 2.1-2 Input/Output Voltage, Temp. Probe Connection points
D
A
B
C
60 Hz Units (15 amp)
A AC Output Cable
B Output Voltage Select
C Battery Power Cable
D AC Input
50 Hz Units
A AC Output Fitting
(Green and Yellow cable
may be used for output
connection)
B Output Voltage Select
C Battery Power Cable
D AC Input
Temp.
Probe
Temp.
Probe
Fig. 2.1-3 Input/Output Voltage, Temp. Probe Connection points