Specifications

IN
The machine has to be installed horizontally on a solid founda-
tion and – if necessary - it has to be  xed by means of screws.
After the installation the space between machine’s foot and floor
has to be casted.
If you have received a control console for the drive of the test-
ing machine you have to make the connection between control
console and machine by means of the delivered hydraulic hose
(or line).
It is important that the machine is installed in a room with a room
temperature between + 16°C and +20°C in order to get exact
test results.
De-aeration of the pressure line
If, contrary to all expectations, air has got in the line between
pump and pressure cylinder (the piston extends jerkily), it can
be removed as follows:
Carefully unscrew the swivel nut of the pressure line at
the cylinder
Switch on the hydraulic power unit, set it at “pressure in-
crease” until oil comes out of the swivel nut. Then strongly
tighten the swivel nut again.
Check the oil-level and – if necessary – add oil.
Installation of the Machine