User guide

042-288-B0-001, Rev. A2
25
2.0 Site Preparation, continued
2.4 NaturalGasMeterCongurations
The gas utility company should have the meter installed prior to generator arrival. Meter
congurations must comply with local codes. The illustrations provided are for illustrative
purposes only.
Fig. 2-6, Collocated Natural Gas Meter Setup for PN-6x-T 7.5kW System
Natural Gas Meter
Street Regulator
Manual Shutoff
Excess Flow Valve
(optional)
Street Pressure
Fig. 2-5, Collocated Natural Gas Meter Setup for CE-3x2 Generator
Gas Utility Box
Natural Gas Meter
Street Regulator
Manual Shutoff
Excess Flow Valve
(optional)
Street Pressure