Specifications
Page 5-7Installation Instructions: Roadrunner 040 EAGLE 100/AM-3000M/VME Upgrade
Table 2 (continued)
CODE MEANING
xb The system is beginning to execute the AMOS monitor program.
If an error occurs at this point, try reloading the latest version of
the system software.
xd System bootup failed because of a time-out error. This code may
indicate faulty memory or an addressing problem.
2E System bootup failed because of a bootstrap loader program
checksum error. This code may indicate a bad PROM or bad
memory.
xF System bootup failed because of an invalid boot device selection.
Check the boot ID switches on the back panel of your computer.
Other status codes can appear during self test; these codes are discussed in the
Alpha
Micro Self Test User’s Guide
.
5.6ADDITIONAL DOCUMENTATION
For additional HARDWARE information, refer to the following:
1.
Your Computer Owner’s Manual
2.Alpha Micro Self Test User’s Guide
3.Alpha Micro Installation and Planning Guide
For additional SOFTWARE information, refer to the following:
1.
AMOS System Operator’s Guide
2.AMOS System Commands Reference Manual
3.The Release Notes for your version of AMOS and the corresponding Product
Support Software Kit (if applicable).
PDI-00172-60, Rev. A02