Specifications

45
820522iL FAZ-WP AIT © Alpha-InnoTec GmbH
completion report and request for factory commissioning
During factory commissioning, the system will be inspected to ensure that it is functioning properly. This ensures that all
factory speci cations have been checked and that the system can operate reliably over an extended period. The factory
commissioning involves costs and is mandatory for extension of the warranty services.
initial commissioning
repeat commissioning
Heat pump type / serial number Regulator type
contractor end customer / operator
electric
heating
other company
Company
Contact person Last name First name
Street address Street address
Postcode Head office Postcode City
Phone Phone
Preferred date:
*)
Alternate date:
*)
Date Time Date Time
*) The contractor must submit the completion report along with the completely reviewed general checklist 14 business
days prior to the desired date of commission.
If there is a con ict with the date, you will be contacted by phone.
.
I hereby con rm that all preliminary work required for commissioning has been carried out and completed.
The system is ready for operation.
Requested commissioning
IBN (Art.-Nr. 16002101)
IBN P5+EW (Art.-Nr. 16002501)
IBN 5+ (Art.-Nr. 16002201)
IBN WP + LG5+ (Art.-Nr. 16000901)
IBN 5+EW (Art.-Nr. 16002301)
IBN L (Art.-Nr. 16005001)
IBN P5+ (Art.-Nr. 16002401)
IBN L EW (Art.-Nr. 16002701)
Free IBN on the basis of the sales campaign ......................................................................
I, the undersigned, hereby request commissioning in return for a fee.
Invoice to
Contractor End customer / operator
Location Date Name (block letters) Signature Company stamp
In the event that the system is not ready for operation and if installation work has to be performed on the system by
the commissioning technician during commissioning, this will involve charges (billed separately) to the contractor. If the
system is not ready for operation, the commissioning technician can request a repeat commissioning, which will involve
additional costs. The contractor or an authorized representative must be present during commissioning.
It is absolutely necessary that the operator is present for the one-time, free instruction that occurs during
commissioning.
A report will be prepared during commissioning.
FAZ WP Formblatt UK820522iL
Completion report
We reserve the right to modify technical specifications without prior notice.
83053100bUK © Alpha-InnoTec GmbH