Specifications
16
We reserve the right to modify technical specifications without prior notice.
83050800aUK – Translation of the operating manual  © Alpha-InnoTec GmbH
Insulating the hydraulic 
connections
 NOTE.
  Insulate the heating circuit and the heat source 
according to relevant local standards and 
guidelines.
  Check all hydraulic connections for leaks. Perform 
pressure test…
 Insulate all connections, vibration isolators, 
connections and pipes of the heating circuit and the 
heat source. Insulate the heat source so that it is 
vapour-diffusion tight.
Installing the control panel
 DANGER!
  Risk of fatal electric shock!
  Electrical connection work must be 
carried out by qualied electricians only.
  Before opening the unit, safely disconnect 
the system from the power supply and 
prevent it from being switched back on!
There are 4 each recesses at different heights in the 
front panel of the unit for fastening the control panel:
1  four upper recesses
2  four lower recesses
There are 4 hooks at the rear of the control panel, 
which are used to hook the control panel on the front 
panel of the unit:










