Commissioning
Proceed as follows:
Conduct a thorough installation inspection and go
through the items on the general checklist.
“General checklist”.
The installation inspection will prevent damage to
the heat pump system that could be caused by in-
correct installation work.
Make sure of the following:
Clockwise rotary eld of the load power
supply (condenser).
Installation and assembly
of the heat pump ac-
cording to the information in this operating manual.
All electric installation work must be properly
completed.
Installation of an all-pole circuit breaker must be
installed for the condenser. It must have a contact
gap of at least 3 mm. A 3-pole automatic cut-out
must be installed.
The heating circuit and the heat source must be
rinsed, filled and bled thoroughly.
All valves and shut-off devices of the heating cir-
cuit must be open.
All valves and shut-off devices of the heat source
must be open.
All pipe systems and components of the system
must be sealed.
Carefully fill out and sign the completion report for
heat pump systems.
“Completion report for heat pump systems”.
In Germany:
Send completion report for heat pump systems to
the manufacturer’s factory customer service de-
partment.
Outside of Germany:
Send completion report for heat pump systems to
the manufacturer’s local partner.
Overview “Customer service”.
The heat pump system will be commissioned by
customer service personnel authorized by the man-
ufacturer. There is a fee for commissioning!