Installation & Assembly

AUBURN | BLUESTONE SAUNA INSTALLATION MANUAL
page 3
Step 4. Position Wall Panels C & D
Position wall panel C into the groove of the back rail. Attach it to wall panel B by way of the tongue and groove t (15
& 16). Secure it by tapping it into place with a rubber mallet. Position wall panel D into the groove to the right-side rail
and push ush against the back rail (17). Being sure panels D and C are ush with each other, fasten them together
using the 2” screws (18).
Step 5. Finish Wall Panels
Position wall panel E into the groove of the right-side rail. Slide wall panel E into place with wall panel D (19). Panel
E connects to panel D via tongue and groove so there is no need to use screws. Use a rubber mallet to secure the t.
Place window panel F in the groove on the front rail (20) and push the at end against wall panel E. Being sure the two
panels are ush, fasten them together using 2” screws through the predrilled holes on panel E (21).
Now place door panel G onto the front rail, being sure to snip the twine holding the door to the frame (22). Push the
door panel into window panel F to secure the tongue and groove t. Now place window panel H on the front rail and
push into door panel G (23). Finally, place window panel I on the left-side rail and push into wall panel A (24). Panels
I and A connect via tongue and groove t. Now, being sure window panels I and H are ush with each other, secure
them together using 2” screws through the predrilled holes on window panel I (25).
Image 15 Image 16 Image 17 Image 18
Image 19 Image 20 Image 21
Image 22 Image 23 Image 24 Image 25